North Carolina coverage
Fire sprinkler design services in North Carolina
We take overflow design work from North Carolina sprinkler contractors: fabrication-ready shop drawings and NFPA 13 hydraulic calculations, at the rates published on this site.
Where we work in North Carolina
Most of our North Carolina work comes from Charlotte, Raleigh, Greensboro and Durham, though the rate card and the schedule are the same anywhere in the state.
[CONFIRM: one or two sentences specific to North Carolina — market character, submittal practice, anything a designer working there would know. Without this, every state page reads the same and this one earns nothing.]Pricing does not change by state. A North Carolina project is priced from the same published card as any other, with the same $1,750.00 minimum project fee and the same 2 included revision rounds.
Rate schedule, in part
REV 0 — ISSUED FOR BIDDING| Per SF | ≤ 15,000 | 15,001 – 50,000 | 50,001 – 150,000 | > 150,000 |
|---|---|---|---|---|
| Light | $0.14 | $0.11 | $0.09 | $0.07 |
| Ordinary | $0.18 | $0.14 | $0.11 | $0.09 |
Minimum project fee $1,750.00. See the full rate card for extra hazard, storage, modifiers and add-ons.
Delegated design in this state
Contract documents on most North Carolina projects set a performance requirement and leave the sprinkler design to the contractor. That is the work we do: we produce the design that satisfies the specification, and the installing contractor stays the responsible party in front of the owner.
Delegated-design acceptance varies by jurisdiction. We confirm that a given authority having jurisdiction will accept the work product at scope confirmation, before any design work starts.
PE-stamped design documents are available in select states as an add-on. We confirm whether a stamp is available for your specific North Carolina project at scope confirmation rather than claiming it here in advance. See coverage.
What you get back
- Fabrication-ready shop drawings, plan and elevation, with a sheet index
- Hydraulic calculations with the demand point and the supply curve
- Stock listing and cut lists suitable for fabrication
- Hanger and seismic bracing layout where the project requires it
- A submittal package assembled for the authority having jurisdiction
- Native design files plus PDF, delivered together
Scope confirmed within 4 business hours of receiving plans.
Price a North Carolina job now
Enter the zones and the calculator returns the itemized figure we would invoice. No quote request, no wait.