Skip to content
BranchlineDesign
Menu

South Carolina coverage

Fire sprinkler design services in South Carolina

We take overflow design work from South Carolina sprinkler contractors: fabrication-ready shop drawings and NFPA 13 hydraulic calculations, at the rates published on this site.

Where we work in South Carolina

Most of our South Carolina work comes from Charleston, Columbia, Greenville and Rock Hill, though the rate card and the schedule are the same anywhere in the state.

[CONFIRM: one or two sentences specific to South Carolina — market character, submittal practice, anything a designer working there would know. Without this, every state page reads the same and this one earns nothing.]

Pricing does not change by state. A South Carolina project is priced from the same published card as any other, with the same $1,750.00 minimum project fee and the same 2 included revision rounds.

Rate schedule, in part

REV 0 — ISSUED FOR BIDDING
Design fee per square foot for light and ordinary hazard, by total project square footage.
Per SF≤ 15,00015,001 – 50,00050,001 – 150,000> 150,000
Light$0.14$0.11$0.09$0.07
Ordinary$0.18$0.14$0.11$0.09

Minimum project fee $1,750.00. See the full rate card for extra hazard, storage, modifiers and add-ons.

Delegated design in this state

Contract documents on most South Carolina projects set a performance requirement and leave the sprinkler design to the contractor. That is the work we do: we produce the design that satisfies the specification, and the installing contractor stays the responsible party in front of the owner.

Delegated-design acceptance varies by jurisdiction. We confirm that a given authority having jurisdiction will accept the work product at scope confirmation, before any design work starts.

PE-stamped design documents are available in select states as an add-on. We confirm whether a stamp is available for your specific South Carolina project at scope confirmation rather than claiming it here in advance. See coverage.

What you get back

  • Fabrication-ready shop drawings, plan and elevation, with a sheet index
  • Hydraulic calculations with the demand point and the supply curve
  • Stock listing and cut lists suitable for fabrication
  • Hanger and seismic bracing layout where the project requires it
  • A submittal package assembled for the authority having jurisdiction
  • Native design files plus PDF, delivered together

Scope confirmed within 4 business hours of receiving plans.

Price a South Carolina job now

Enter the zones and the calculator returns the itemized figure we would invoice. No quote request, no wait.

Other states